• Work package 4 is about structured finance – designing business models and financing models and financing products that drive delivery of E=0 solutions in each country.  This deliverable, D4.3 provide

  • Work package 5 is about developing energy performance guarantees and refurbishment package delivery protocols for net zero energy retrofits. These deliverables, 5.1 and 5.2, act as a delivery protocol

  • Work package 2 is about validating and tuning the business and delivery model for the UK and French markets, building on the earlier experiences in the Netherlands.

  • Transition Zero aims to make new zero energy retrofits for houses a mass market reality. Work package 6 is about creating the conditions for collective concept deals – a commitment to refurbish 5,000

  • Net zero energy homes in the Netherlands put to the test both on technical performance and customer satisfaction. The performance insights from monitoring over 600 net zero energy retrofits in the Net

  • Work Package 7 is about ‘pipeline development’: organisation of mass volume demand and closing refurbishment contracts for 5,000 dwellings both in UK and FR and refurbishment contracts for additional

  • This deliverable, D1.5, is a paper describing courses and workshops convened to facilitate collaboration and knowledge transfer between members of the Dutch, French and UK teams. In particular this de

  • Work Package 3 is about enabling regulation – possibilities within the existing regulatory framework in each country and improvements to accelerate market uptake of E=0 solutions. The objectives of th

  • Work package 8 is about the dissemination of the approach and results of the programme and influencing other initiatives including redirecting (public) funds. This deliverable, D8.3 is a paper on the

  • Some 50 international partners of Energiesprong gathered in Nottingham, UK during 24 and 25 October 2017 to share good practice and discuss the development of the Energiesprong concept.  Energiesprong

  • This is the agenda for the 24th & 25th of October for the Transition Zero & Interreg E=0 EnergieSprong into action PDF Download 

  • Work package 8 is about the dissemination of the approach and results of the programme and influencing other initiatives including redirecting (public) funds. This deliverable, D8.3 is a paper on the

  • 8.2 is a Slide Deck of the Energiesprong Transition Zero approach. D8.2 Transition Zero Slide Deck – NL & UK July2017 PDF Download

  • D8.1, is a position paper on the design of funding instruments designed to improve the energy efficiency of buildings in the three main markets of the project and more widely across the EU. Transition

  • D6.1, is the summary of progress over the first 5 months. This deliverable does not include any content relating directly to the Netherlands, as they have passed through an equivalent working stage pr

  • This deliverable, D4.1, summarises the financing for the first batch of refurbishments on a project basis in the UK and France. D4.1 Financing for pilot project contracts July 2017 PDF Download

  • This deliverable, D3.3 looks at recommendations for decision makers of necessary or desirable changes to the regulatory framework. It covers recommendations for decision makers in France, the UK and a

  • The purpose of this assessment is to establish how Energiesprong solutions can be implemented within the existing regulatory framework; this is relevant to the early market demonstrators. Building on

  • D2.4, provides a generic example of Tender specifications for net zero energy (E=0) refurbishments, based on UK conditions. As noted in section 2, the French market is insufficiently developed to prov

  • D2.3 provides an analysis of energy performance contracting approaches to learn from in the implementation of the Transition Zero programme. Energy performance contracting is a key element to make the

  •  D2.2, sets out the assessment of financing options, the business case and the work plan for WP4 (Structured finance – designing business models and financing products that drive delivery of E=0 solut

  • D2.1, is the Start document for the pilot phase. It contains two main sections, relating to the UK (in English) and to France (in French). The paper summarises the procurement approach for net zero en

  • The Energiesprong uk proposition brochure can be found here.

  • Based on the successful Dutch energy transition program Energiesprong in 2014 a consortium has been formed to scale the developed net zero refurbishment technology and accompanying business case for h